Home » December 2015: EOLYS-RE installs a wind turbine on the Champs-Elysees in Paris in relation with COP 21

December 2015: EOLYS-RE installs a wind turbine on the Champs-Elysees in Paris in relation with COP 21

Paris, December 2015: EOLYS-RE installs a 12 KW METRONOME small wind turbine on the Champs-Elysees in Paris in relation with COP 21. The wind turbine is equipped with a frameless alternator ALXION 500STK4M and supplies street lamps.

More information

News

JANUARY 2020: ALXION 300STK1M MOTOR KIT IMMERSED IN A HEAT TRANSFER FLUID

During two years, ALXION has devoted research and development activities to the design and testing of roto-stator kits for STK motors whose air gap ...

December 2017:

ST motors: the online catalogue includes now  versions of 145ST1M, 145ST3M, 190ST1M, 190ST3M ...

March 2017:

ALXION, 30 YEARS OF INNOVATION IN ELECTRIC ...